Energy economics

Prior to concrete planning of location and cable a feasability study in consideration of ecological interests is required.

The Planungsgemeinschaft LaReG develops within the scope of regional planning or planning approval procedures environmental impact surveys for natural gas, oil and further product lines, cavern storages, burried cables, biogas plants and wind and solar power plants. Further expert opinions comprise regional sensitivity studies, FFH impact assessments, technical papers with reference to the legal protection of species as well as a judgment and estimation of environmental impacts of route variants and the demonstration of measures on avoidance and decrease of impairments. Surveys of types of biotopes and habitats, animals and plants in terrestrial and limnic areas are conducted.

Project selection

Trassenvoruntersuchung 380kV Höchstspannungsleitung Halbemond-Emden-Ost (2020)
Landkreis Aurich, Stadt Emden
Umweltverträglichkeits-Vorprüfung und Artenschutzfachbeiträge für die Reaktivierung von Bohrplätzen im Raum Bomlitz/Dorfmark (2020)
Landkreis Heidekreis
UVS zum Raumordnungsverfahren ETL 180 Brunsbüttel Hetlingen (2019)
Kreis Dithmarschen, Kreis Steinburg, Kreis Pinneberg, Landkreis Stade
Raumordnerische Vorprüfung für die Speicherwasserrückführung Rehden (2019)
Landkreis Diepholz
Picture

UVS zum Genehmigungsverfahren für die Gaspipelines Bunde-Etzel (56 km); 2007

Für den Neubau von zwei parallel verlaufenden Piplines (je DN 1200) für den Transport von Gas zwischen dem Kavernengelände in Etzel und dem Gasknot... (more)